Kitchen Remodeling
Plan the kitchen around how you use it.
A kitchen works or fails on decisions made before anything is ordered: layout, clearances, appliance locations, electrical capacity, plumbing, and how the materials meet. We work those through together, so the order goes out against a plan rather than an assumption.
Work that moves plumbing, adds circuits, or touches the panel gets permitted. What changes a kitchen mid-job is usually what turns up behind the wall, and when that happens you get the options and the cost before anyone proceeds.
What we work through
Layout and clearances
Appliance locations, island spacing, walkways, door swings, and seating, resolved before cabinetry is released.
Cabinetry and storage
Cabinet dimensions, fillers, appliance panels, corner conditions, and how cabinetry meets walls and ceilings.
Appliances and systems
Power, gas, plumbing, ventilation, and panel capacity, checked against the layout before anything is ordered.
Lighting and electrical
Task and decorative lighting, outlets, switches, and appliance circuits, coordinated with the cabinetry plan.
Materials and transitions
Counters, backsplash, flooring, edges, and openings, settled before fabrication.
Work through the kitchen before orders are released.
Plans, elevations, and 3D views let us settle cabinetry, clearances, storage, and how the materials meet while everything is still changeable.
- Whether the layout changes or the plumbing and gas stay where they are
- Cabinetry: stock, semi-custom, or built for the room
- Counter and tile selections
- Electrical upgrades the existing panel may require
We price each project after a site visit, then put the scope and the number in writing before any work starts.